Wind Turbine Tower Transition Piece

After-sales Service: 1 Year
Warranty: 1 Year, 1 Year
Condition: New
Certification: CE, ISO9001
Standard: DIN, ASTM, GOST, GB, JIS, ANSI, BS
Customized: Customized
Diamond Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SSI-HDCZ
Material
Metal
Application
Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal Forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery, Power, Port, Coal, Steel, Metallurgy, Chemical Ind
After-Sales Service
Yes
Feature
Corrosion Resist
Character
High Performance
Advantage
Durable
Benefit
Low Maintenance
Price
Dost Effective
Transport Package
Customized
Specification
customized
Trademark
SSI
Origin
China
HS Code
8419609090
Production Capacity
1000 Sets / Year

Product Description

Wind Turbine Tower Transition Piece

 

For surface treatment of local corrosion parts, the oxidized corrosion layer and old coating of the corrosion parts shall be completely removed by spraying, and the exposed metal base metal shall reach grade s2.5. The edges of the treated parts shall be polished with power grinding wheel to form a gradient transition layer so as to have a smooth and smooth surface after paint construction. (compared with the traditional manual grinding, the spraying method can completely and thoroughly remove the rust and old coating in the deep layer of the oxidized or even pitted steel plate, and can form good anchor chain type rough lines, which is conducive to forming good bonding force with the primer.)

 After spraying, the primer shall be manually brushed (roller coated) according to the original supporting scheme to reach the specified film thickness. (hand brushing and roller coating can control the position of primer during construction, do not pollute the original coating on the edge, and also effectively control the consumption of primer)

 Brushing or spraying can be used for the construction of intermediate paint to reach the original supporting construction film thickness. The edge area shall be protected and shielded by spraying. The shape of the shield shall be "mouth" shape to form a regular appearance effect (the edge protection of intermediate paint construction can effectively control consumption and ensure the appearance effect)

Topcoat Construction: if the local repair scheme is adopted, the topcoat can be directly sprayed or brushed to meet the original design thickness requirements after the intermediate paint construction meets the thickness standard and meets the requirements of point 3. If the scheme of full construction finish is adopted, the outer surface of the whole tower shall be thoroughly cleaned after the intermediate paint construction reaches the thickness standard. Cleaning method: use 80-100 mesh abrasive cloth to scrub the coated surface, remove the powdered layer, dirt and dirt on the surface of the old coating, and use chemical cleaning to remove the oil stain on the part with oil stain, so that the coated surface can be completely cleaned and then the finish coat can be sprayed.

 

Feature

product wind turbine tower
painting PPG
color yellow
material carbon steel
application offshore
welding test NDT
steel working welding and inspected
process rolled

Manufacturing process 
1. Material cutting
Wind Turbine Tower Transition Piece
2.Steel plate rolling and welding

Wind Turbine Tower Transition Piece
3. Welding

Wind Turbine Tower Transition PieceWind Turbine Tower Transition Piece
4. NDT test

Wind Turbine Tower Transition PieceWind Turbine Tower Transition Piece

5. Paint inspection

Wind Turbine Tower Transition Piece
6. Testing and inspection instrument

Wind Turbine Tower Transition Piece

7. Wind turbine tower transfer and shipment 

Wind Turbine Tower Transition PieceWind Turbine Tower Transition PieceWind Turbine Tower Transition PieceWind Turbine Tower Transition Piece
We are a professional company in bulk material handling, transportation, storage, processing, accessory equipment design, integration and manufacturing. We can provide a complete set of solutions. Thank you for viewing our website and welcome to purchase! Welcome to be our agent distribution!

Wind Turbine Tower Transition Piece
Products and services available
Material handling equipment
Wind Turbine Tower Transition Piece
Storage equipment
Wind Turbine Tower Transition Piece
If you need above products, please contact us!
 
  
                                                                                                        Shanghai Sunshine Industrial Technology Co. , Ltd. 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now