Pile Foundation and Transition Piece for Offshore Wind Turbine

Product Details
After-sales Service: 3 Year
Warranty: 1 Year, 1 Year
Type: Customization
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Experienced Team
The supplier has 7 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (7)
  • Pile Foundation and Transition Piece for Offshore Wind Turbine
  • Pile Foundation and Transition Piece for Offshore Wind Turbine
  • Pile Foundation and Transition Piece for Offshore Wind Turbine
  • Pile Foundation and Transition Piece for Offshore Wind Turbine
  • Pile Foundation and Transition Piece for Offshore Wind Turbine
  • Pile Foundation and Transition Piece for Offshore Wind Turbine
Find Similar Products

Basic Info.

Model NO.
SSI-HDCZ
Material
Steel, Metal
Lifting Capacity
Customization
Fixed Form
Customization
Lifting Eye Type
Customization
Rope Core Type
Customization
Power Source
Electric
Shape
Customization
Certification
GS, CE, ISO 9001, CE, ISO9001
Sling Color
Customization
After-Sales Service
["1 Year","Yes"]
Condition
New
Standard
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Customized
Customized
Application
Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal Forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery, Power, Port, Coal, Steel, Metallurgy, Chemical Ind
Feature
Corrosion Resist
Character
High Performance
Advantage
Durable
Benefit
Low Maintenance
Price
Dost Effective
Transport Package
Customized
Specification
customized
Trademark
SSI
Origin
China
HS Code
8419609090
Production Capacity
1000 Sets / Year

Product Description

Pile foundation and transition piece for offshore wind turbine

 

The Offshore Wind Power engineering business mainly covers the design, manufacturing and construction general contracting business of offshore wind power projects, including the design optimization, manufacturing, transportation and installation of offshore wind turbine foundation, as well as the installation of wind turbine, the installation of booster station, the laying of submarine cables and the operation and maintenance of wind farm. Our company is committed to providing owners with overall solutions for offshore wind farm construction projects. Our company has purchased the first jack-up offshore wind power operation platform in China, and has provided the construction scheme for a number of offshore wind farms in China (including Hong Kong and Taiwan).

Our company is developing an international leading single 8MW offshore wind power tower, which will lay a more solid foundation for our company to build a wind power equipment manufacturing enterprise with international competitiveness.

The Onshore Wind Power engineering business mainly covers the design, manufacturing and installation of onshore wind power project tower, which can manufacture the 1.5MW-3MW wind turbine tower.

Transition piece is the steel structure of the offshore wind turbine, that is installed between tower and lower foundation. It is one of the supporting structure.

Fabricating transition piece capable of resisting extreme environmental conditions requires thicker plate, or higher-strength steel, or both along with higher-strength weld deposits. Welding such material requires welding procedures and filler metal with a chemical composition that delivers the same mechanical properties in the weld deposit.

 

Feature

product wind power support structure
painting HEMPEL
color yellow
material high quiality steel
application offshore and onshore
welding test NDT
steel working welding and inspected
process rolled

Manufacturing process 
1. Material cutting
Pile Foundation and Transition Piece for Offshore Wind Turbine
2.Steel plate rolling and welding

Pile Foundation and Transition Piece for Offshore Wind Turbine
3. Welding

Pile Foundation and Transition Piece for Offshore Wind TurbinePile Foundation and Transition Piece for Offshore Wind Turbine
4. NDT test

Pile Foundation and Transition Piece for Offshore Wind TurbinePile Foundation and Transition Piece for Offshore Wind Turbine

5. Paint inspection

Pile Foundation and Transition Piece for Offshore Wind Turbine
6. Testing and inspection instrument

Pile Foundation and Transition Piece for Offshore Wind Turbine

7. Wind turbine tower transfer and shipment 

Pile Foundation and Transition Piece for Offshore Wind TurbinePile Foundation and Transition Piece for Offshore Wind TurbinePile Foundation and Transition Piece for Offshore Wind TurbinePile Foundation and Transition Piece for Offshore Wind Turbine
We are a professional company in bulk material handling, transportation, storage, processing, accessory equipment design, integration and manufacturing. We can provide a complete set of solutions. Thank you for viewing our website and welcome to purchase! Welcome to be our agent distribution!

Pile Foundation and Transition Piece for Offshore Wind Turbine
Products and services available
Material handling equipment
Pile Foundation and Transition Piece for Offshore Wind Turbine
Storage equipment
Pile Foundation and Transition Piece for Offshore Wind Turbine
If you need above products, please contact us!
 
  
                                                                                                        Shanghai Sunshine Industrial Technology Co. , Ltd. 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier